Not fewer people. The same people running twice the plant.

PLC and SCADA, weighing and batching, sorting and grading, traceable batch records — and the order to buy them in, so each step pays for the next on the way from 5 TPD to 20. We name the constraint before anyone raises a purchase order, because the wrong first machine gets paid for twice.

[ what usually goes wrong ]

Automation gets bought as machines. A sorter here, a weigher there, each with its own controller and its own screen, none of them talking, and a supervisor still walking the floor with a notebook to find out what happened on the night shift. The plant now has more equipment and the same blindness.

[ what we do ]

In this order.

The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.

  1. 01

    We find the constraint first. It is usually not the machine anyone wants to buy.

  2. 02

    We sequence the mechanisation so each step pays for the next — what to mechanise at 5 TPD, what waits until 12, and what never justifies itself at your scale.

  3. 03

    We specify the control layer as one system: PLC, instrumentation, and a SCADA that shows the plant as it behaves rather than as a settings menu.

  4. 04

    We wire the records so a batch is traceable end to end without anyone retyping it — which is also what an FSSAI or buyer audit is really asking for.

  5. 05

    We train the operators, and design the screens for the person who has to read them at 22:00 during a fault.

[ what you get ]

  • A constraint analysis with numbers attached
  • A mechanisation roadmap tied to volume thresholds
  • Control and instrumentation specification
  • An automation capex model with the labour case and the yield case stated separately, so you can see which one is carrying the argument

[ what it touches ]

FSSAI Schedule 4 record-keeping, buyer and export audit requirements, and the electrical and safety standards that come with a control system. Where a refrigeration plant is in scope, the same statutory obligations as the storage work.

The scheme table

[ who this isn’t for ]

Anyone hoping automation will fix a process nobody has written down. Mechanising an undefined process only produces the wrong answer faster, so we will not specify a control system for a line whose sequence is still an argument between two supervisors. We say so, and point you at the process work first — it comes cheaper than the PLC.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days

[ the rest of it ]