deswal/sandbox

[ consulting — 01 ]

We get the file cleared. Or we tell you it won’t be.

PMKSY, the Agriculture Infrastructure Fund, NHB capital investment, PMFME, and the state layer most projects underuse — the UP Food Processing Industry Policy 2023 alone carries 35% capital subsidy up to ₹5 crore, and 50% up to ₹10 crore on frozen storage. We read your project against every one of them, and file only the ones that fit.

[ what usually goes wrong ]

Someone reads that cold storage gets a 50% subsidy, sizes a project around it, and finds out eighteen months later that the 50% was the hilly-area rate, that the component they were counting on was discontinued two budget cycles ago, or that the subsidy is back-ended and credit-linked so the bank needed the whole amount up front anyway. The scheme was never the problem. Reading it second-hand was.

[ what we do ]

In this order.

The sequence is the method. Most of what goes wrong on projects like these is a step taken before the one that should have informed it.

  1. 01

    We read your project against every central and state scheme it could touch — against the current guidelines, not last year’s summary of them.

  2. 02

    We tell you which ones fit, which ones stack, and which are a waste of your time. In writing, before you pay anyone for a DPR.

  3. 03

    We build the DPR — techno-economic feasibility, debt-equity structure, equipment schedule, projections, and compliance with the issuing body’s technical norms.

  4. 04

    We file it, chase it, and answer the queries the sanctioning committee raises.

  5. 05

    We keep the compliance tail — the utilisation certificates and inspections that come after disbursement, and that people forget about until they are asked.

[ what you get ]

  • A written eligibility opinion, before any design work is commissioned
  • A bankable DPR
  • A filed application with acknowledgement
  • A calendar of what is owed to whom, and when

[ what it touches ]

PMKSY (cold chain, and the unit scheme), the Agriculture Infrastructure Fund, NHB capital investment subsidy, PMFME, and state policy — for Uttar Pradesh, the Food Processing Industry Policy 2023. The current position on each is in the table below, with the date it was last checked against the issuing body’s own guidelines.

[ the schemes ]

Where each one stands, and when we last checked.

These figures move, sometimes mid-year, and much of what is published about them online was true when it was written and is not now. Every row below links to the issuing authority’s own page, and carries the date we last read it. A discontinued scheme stays listed rather than disappearing — knowing it is gone is more useful than silence.

SchemeWhat it givesStatus
PMKSY — Integrated Cold Chain and Value Addition InfrastructureMinistry of Food Processing IndustriesSource 35% of eligible project cost in general areas; higher rates for North-Eastern, hilly and scheduled areas.Revised operational guidelines dated 22 May 2025. Confirm the current application window before committing to a timeline.ActiveChecked 04 Sept 2026Guidelines 22 May 2025
PMKSY — Creation / Expansion of Food Processing and Preservation CapacitiesMinistry of Food Processing IndustriesSource Grant-in-aid on eligible project cost for new units, expansion and modernisation.Scheme guidelines dated 22 January 2025.ActiveChecked 04 Sept 2026Guidelines 22 Jan 2025
PMKSY — Creation of Backward and Forward LinkagesMinistry of Food Processing IndustriesSource —Discontinued under the 15th Finance Commission cycle, with provision retained only for existing commitments. Listed here because it is still being advertised elsewhere.DiscontinuedChecked 04 Sept 2026
Agriculture Infrastructure FundDepartment of Agriculture and Farmers WelfareSource 3% interest subvention on loans up to ₹2 crore for up to 7 years, with CGTMSE credit guarantee cover. Not a grant.Covers cold storage, warehouses, silos, packhouses, assaying, sorting and grading units, ripening chambers and primary processing centres.ActiveChecked 04 Sept 2026
NHB Capital Investment SubsidyNational Horticulture BoardSource Credit-linked back-ended subsidy: 35% of capital cost in general areas, 50% in North-Eastern, hilly and scheduled areas.Horticulture produce. Capacity bands apply.ActiveChecked 04 Sept 2026
PMFMEMinistry of Food Processing IndustriesSource 35% credit-linked capital subsidy, capped at ₹10 lakh per unit. Released to the bank, not to the applicant.Micro units, ODOP-linked.ActiveChecked 04 Sept 2026
UP Food Processing Industry Policy 2023Invest UPSource 35% capital subsidy on plant, machinery and technical civil work for new units, capped at ₹5 crore; 25% capped at ₹1 crore for expansion and modernisation; 50% up to ₹10 crore on frozen storage and value addition; 50% on rural solar up to 75 kVA, 90% for women entrepreneurs; reefer vehicle interest subsidy up to ₹50 lakh over five years; 25% export freight subsidy.The layer most Uttar Pradesh projects underuse. The whole state counts as a single mandi for fee and cess.ActiveChecked 04 Sept 2026
PM-KUSUMMinistry of New and Renewable EnergySource Component A — grid-connected plants on barren land. Component B — standalone solar pumps. Component C — solarisation of existing grid-connected pumps.Deadline extended to 31 March 2027 for eligible projects whose PPAs were signed on or before 31 December 2025.ActiveChecked 04 Sept 2026

Oldest entry checked 04 Sept 2026 against the sources linked above. Nothing here is an eligibility opinion. That comes in writing, for your specific project, and before you have spent anything.

[ who this isn’t for ]

Anyone who wants a project designed backwards from the grant. If the economics only work with the subsidy, we say so and we do not take the file. We also do not do liaison work: there is no relationship with a sanctioning officer on offer here, and a file that clears only with one is a file to take elsewhere.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days

[ the rest of it ]