deswal/sandbox

[ consulting ]

A cold store is easy to buy. A cold store that pays for itself is not.

We design agri and food-processing infrastructure — cold and frozen storage, IQF lines, packhouses, refrigeration — get it funded under the schemes it actually qualifies for, and connect it to the farms and buyers that keep it full.

We run a plant like this one — ammonia refrigeration, cold and frozen rooms, and a processing line in Sikandrabad, Uttar Pradesh. Every number on this page came out of paying its bills, not out of a brochure.

[ why us ]

Four claims, and all of them checkable.

We run a plant, not a portfolio

The Sikandrabad plant is not a reference site we visited once. Its electricity bill, its compressor hours and its pull-down times are ours to pay for and ours to read. So when we tell you what it costs to hold a frozen room through an Uttar Pradesh summer, the figure came off a meter rather than a brochure.

No supplier pays us

We do not take commission, referral fees or margin from any equipment brand. We do not write a specification around a vendor we happen to know. Send us your quotes and we will tell you which line item is padded, which specification was written around one supplier, and what the AMC actually costs in year three.

The subsidy is a consequence, not the plan

A project that only works because of a grant is a project that does not work. We size the thing so it stands on utilisation and margin — and then get you every rupee the schemes allow.

You get drawings and numbers, not a deck

Layouts, heat load calculations, a single-line diagram, an equipment schedule, a bankable DPR, and a spreadsheet you can open and argue with. Written so you can hold it, question it, and keep it whether or not you proceed.

[ what we do ]

Seven services, and they happen in roughly this order.

[ how it goes ]

Five phases, and the first one can end the project.

  1. 01

    Walk

    We come to the site, or to the land if there is no site yet. Half a day. Produce and volumes by season, power connection and tariff, water, road access, land papers, and whatever you already own that we should design around.

    [ you get ]A written sizing note, and an honest answer about whether to build this at all.

  2. 02

    Size

    Capacity, layout, refrigeration load, energy, staffing. What to build now, what to leave a stub for, what not to build. With the number attached.

    [ you get ]Layouts, heat load calculations, an equipment schedule, and a capex and opex model you can change.

  3. 03

    Fund

    Which scheme, which lender, in which order. The DPR, the annexures, the file. Or the answer that no scheme fits this project, and what that means for it.

    [ you get ]A bankable DPR and a filed application — or a written reason not to file one.

  4. 04

    Build

    Vendor shortlist, quote comparison line by line, drawings issued for construction, and someone on your side of the table during negotiation. Commissioning witnessed, pull-down tested against the design rather than against the promise.

    [ you get ]A plant that performs the way the calculation said it would.

  5. 05

    Run

    SOPs, log sheets, operator training, and the first season watched closely. And if the screens that came with the plant are fighting your operators at 22:00 — that is where the software starts.

    [ you get ]A plant your team can run without you standing in it.

[ the other half ]

The infrastructure and the software are the same job, seen from two ends.

The plant we designed is the plant Sunny SCADA watches. The procurement we set up is the procurement Sunny ERP records. You can hire us for either end — most people start with the concrete.

[ the questions we get ]

Answered before you ask.

How much subsidy can I actually get?
Between nothing and roughly half your project cost, and the honest answer needs your state, your produce, your capacity and your entity type. As a shape: NHB runs 35% of capital cost in general areas and 50% in North-Eastern, hilly and scheduled areas. PMKSY’s cold chain component runs 35% of eligible cost in general areas. AIF is not a grant at all — it is 3% interest subvention on loans up to ₹2 crore for up to seven years, with a CGTMSE guarantee, and it stacks with the others. Uttar Pradesh adds its own 35% capital subsidy capped at ₹5 crore, and 50% capped at ₹10 crore on frozen storage.
Do you guarantee approval?
No. Nobody honest does. What we will do is tell you before you spend anything whether we think the file clears, and why — in writing, so you can take that read to someone else and test it.
What does a cold store cost?
Roughly ₹0.30–0.80 lakh per MT depending on temperature regime, location and how much of it you are automating; published government model DPRs put a basic 1,000 MT multi-commodity chilled store around ₹2.5–3 crore. Frozen is materially more than chilled. Anyone who quotes a per-MT number before asking what you are storing is quoting you a different building.
Do I need the land in my name?
For most schemes you need clear title, or a registered long lease with enough years left on it. This is the single most common reason a file stalls, and it is worth resolving before anything else is drawn.
Can you work outside Uttar Pradesh?
Yes. Central schemes are the same everywhere; the state layer changes, and we read your state’s policy before quoting. Sites more than a day’s travel from Greater Noida carry travel at cost.
What do you charge?
The same five steps as every other engagement here, priced the same way. The problem statement costs nothing. We reply in writing within three working days. The site visit and the written sizing note are the discovery audit — a fixed fee, modest because it is the trust purchase, and credited against deployment. Design and DPR work is fixed-price per project, quoted in the blueprint after the visit, so you see the whole number before you commit a rupee to building. Subsidy filing is a fixed fee plus a success component. No equipment supplier pays us anything, so nothing we recommend is being funded by someone else.

Scheme rates, caps and windows change, sometimes mid-year. Every figure quoted here shows the date it was last checked against the issuing authority’s own guidelines — see the scheme table. Nothing on this page is an eligibility opinion.

[ what happens next ]

Tell us what you’re trying to build.

The useful details are the boring ones: what you want to store or process, roughly how much of it, where the land is and whether it is yours, and what already exists on the site. Rough numbers beat no numbers.

Tell us the problem

We reply in writing within three working days